101![Forum Agenda Date: June 3, 2011 Venue: Lectue Theater C, Hong Kong University of Science and Technology, Clear Water Bay, Kowloon Time/Event 8:00-8:45 Forum Agenda Date: June 3, 2011 Venue: Lectue Theater C, Hong Kong University of Science and Technology, Clear Water Bay, Kowloon Time/Event 8:00-8:45](https://www.pdfsearch.io/img/f435b16fc1691dc39234903760ba5812.jpg) | Add to Reading ListSource URL: www.bm.ust.hkLanguage: English - Date: 2011-06-02 04:02:45
|
---|
102![LEGCO QUESTION NO. 20 Annex The design capacities per hour, present volume/capacity (v/c) ratios and preliminary v/c ratios after the proposed additional public housing developments of the respective roads in Tseung Kwan LEGCO QUESTION NO. 20 Annex The design capacities per hour, present volume/capacity (v/c) ratios and preliminary v/c ratios after the proposed additional public housing developments of the respective roads in Tseung Kwan](https://www.pdfsearch.io/img/45a273348e7201912a4081c75b078fd5.jpg) | Add to Reading ListSource URL: gia.info.gov.hkLanguage: English - Date: 2015-01-21 01:03:20
|
---|
103![Microsoft Word - JtLetter_PoToiPreliminDraftOZP_201412_v2 Microsoft Word - JtLetter_PoToiPreliminDraftOZP_201412_v2](https://www.pdfsearch.io/img/5c7b0abe22fc0f767aa73c132ab619eb.jpg) | Add to Reading ListSource URL: www.greenpower.org.hkLanguage: English - Date: 2015-01-29 21:15:55
|
---|
104![Fatal Accident Report PV 93428 Fatal Accident Report PV 93428](https://www.pdfsearch.io/img/ba4e27d61244329906cfdf32c3172ee1.jpg) | Add to Reading ListSource URL: www.mardep.gov.hkLanguage: English - Date: 2014-04-29 09:18:15
|
---|
105![Transfer of sovereignty over Macau / Xiguan / Clear Water Bay Peninsula / Po Toi O / Liwan District Transfer of sovereignty over Macau / Xiguan / Clear Water Bay Peninsula / Po Toi O / Liwan District](/pdf-icon.png) | Add to Reading ListSource URL: www.had.gov.hkLanguage: English - Date: 2015-01-21 04:01:29
|
---|
106![N221 Historic Building Appraisal Shaw Studio (邵氏片場), Clear Water Bay Road, Sai Kung, N.T. Hong Kong was once the world’s largest film producing centre. The annual Historical N221 Historic Building Appraisal Shaw Studio (邵氏片場), Clear Water Bay Road, Sai Kung, N.T. Hong Kong was once the world’s largest film producing centre. The annual Historical](https://www.pdfsearch.io/img/b144128360179cbf0f5ef2f5be46482a.jpg) | Add to Reading ListSource URL: www.aab.gov.hkLanguage: English |
---|
107![Clear Water Bay Road / Ngau Chi Wan / Hong Kong / Wong Tai Sin District Clear Water Bay Road / Ngau Chi Wan / Hong Kong / Wong Tai Sin District](/pdf-icon.png) | Add to Reading ListSource URL: www.lcsd.gov.hkLanguage: English |
---|
108![Introduction of Cyberport to HKUST Entrepreneurs 7 Dec[removed]Wed) 12:00 – 1:30 pm Room[removed]Lift 3), HKUST Clear Water Bay Campus (with light refreshments) Introduction of Cyberport to HKUST Entrepreneurs 7 Dec[removed]Wed) 12:00 – 1:30 pm Room[removed]Lift 3), HKUST Clear Water Bay Campus (with light refreshments)](https://www.pdfsearch.io/img/628d64a6b3f39bdd04ad2c99131afb08.jpg) | Add to Reading ListSource URL: www.ec.ust.hk- Date: 2012-07-25 22:48:41
|
---|
109![Copyright Notices The content available in this report, including but not limited to all text, graphics, drawings, diagrams, photographs and compilation of data or other materials are subject to copyright owned by the G
Copyright Notices The content available in this report, including but not limited to all text, graphics, drawings, diagrams, photographs and compilation of data or other materials are subject to copyright owned by the G](https://www.pdfsearch.io/img/2f7383f4e5f83ef9f44af84c79d9a56d.jpg) | Add to Reading ListSource URL: beachwq.gov.hkLanguage: English - Date: 2014-10-20 02:36:37
|
---|
110![[CP407]D:\REAL_JOB\382087_0221\PLATES.CDR\SEPT02 Plate 1 The Site viewed from Clear Water Bay Road. The cable alignment emerges from Ma On Shan Country Park between the base of the steps and the large boulder. (right of [CP407]D:\REAL_JOB\382087_0221\PLATES.CDR\SEPT02 Plate 1 The Site viewed from Clear Water Bay Road. The cable alignment emerges from Ma On Shan Country Park between the base of the steps and the large boulder. (right of](https://www.pdfsearch.io/img/4fc0dbc421731485a76a2e0741d24118.jpg) | Add to Reading ListSource URL: www.epd.gov.hkLanguage: English - Date: 2002-12-18 02:05:51
|
---|